Wednesday, November 12, 2008

The Little Things

I have about five little projects going on at the same time. I have the control box about 90% finished, the center console removed and ready to install the circuit breaker, measurements for a beefed up motor mount, bolting down rear batteries and the vacuum brakes.

Tomorrow I am going to finish the control box and try to get the circuit breaker installed in the car. It's amazing how much the control box has cleaned up the wiring. I even mounted the PB5 Throttle to the side of the box and I think it looks really great. I hope to mount this control box and the controller on a modular board so I can move them for working on the EV or put them into another EV if a make one with similar specs later down the road.

No comments: